Posts

Showing posts with the label SRM

COMPONENT 2.0 SAFETY RISK MANAGEMENT (SRM).

Performance Objective . The organization will develop processes to understand the  critical characteristics of its systems and operational environment and apply this knowledge to    identify hazards, analyze and assess risk and design risk controls. General Design Expectations.   (1) SRM will, at a minimum, include the following processes:         (a) System description and task analysis,          (b) Hazard identification,          (c) Safety risk analysis,          (d) Safety risk assessment, and           (e) Safety risk control and mitigation. (2) SRM process will be applied to:    (a) Initial designs of systems, organizations, and/or products;     (b) The development of operational procedures;     (c) Hazards that are identified in the SA functions ;      (d) Planned changes to operat...